One Stop Solution
Design, Supply, Delivery, Installation testing & Commissioning 2 Nos. of 20TR Packaged Air Conditioning Units with GI Ducting works
Design, Supply, Delivery and Construction of customized Compound Wall including all related approval from related state agencies as per tender terms and conditions
Supply, Delivery & Installation of Sensor Controlled Flushing Systems for Water closet
Renovation for Building 3 Main Reception Counter
Revamping of Facilities records, board room and wash room for executives at Bldg. No. 16
Construction of CNAQ Majliz – Demountable Structure with Fit out, AC and AV
Construction of Female Wash Room Facilities at Bldg. No. 13 Cafeteria
Construction of Office Space including additional washroom, meeting room, toilets and related builder’s civil works for building systems in Bldg. No. 3 level 2
Renovations of First Aid Clinic in Bldg. No. 6.1.03
Refurbishment of Prayer Rooms [Bldg. No. 5, 9, 10, 12, 14 & 20]
Construction of custom made Structural Shade for Central Courtyard
Renovations to Library and Learning Commons – Bldg. No. 14
Cabling and Civil work for IP Cameras
Construction of Atrium # 1, #2, Renovation of Bldg. No. 18
Construction of Washrooms & WC, Changing Room, Wash area and Locker room near Multipurpose Field
Excavation, earthwork, landfilling, compaction, concreting 25N sub base, approx. 4244m² including curbstone painting
Flood Lights and Power Cabling for Cricket field
Fabrication and Fixing of customized Chain Link Fencing, App. 659 LM
Earthwork & Maintenance of Cricket Field & Construction of Pump Room
Renovations in Dental Lab, Room No. 20.2.01, Modification of Prayer room and Ablution room in Bldg. No. 3
Installation of Parking Shade and Power Provision for Club Car Charging in Bldg. No. 16
Fixing of Aluminum Glass Wall in Bldg. No. 14 Level 2
Additional Power and Data sockets as per re-arrangements of Furniture in Bldg. No. 3 – LRC
Pedestrian luminaires for Grass Lawn area between Soccer Pitch and Tennis Court
Facility Management
MEP Maintenance & Cleaning Services
Manpower Supply
Mep and builders works for the proposed coffee shop (kiosk) at crew city.
Modification Works of Existing Suspended Grid Ceiling at ITC-1.
Refurbishment Works at Pediatric Emergency Clinic (PEC) of Rayan and Airport HC
Cylindrical GRP/FRP Water Tanks and Water Tanks Lining at PHCC HC’s.
Upgradations of Substation 15 HC
2500A – Substation upgradation & Updating works for main office building ( Tower – 01 – B+G+M+9 Building). Scope of Works included supply and Installation of New 2500A, MV Panel, Generator, Capacitor panel and Emergency Backup Panel for Each Floor.
Electrical, Mechanical and fire safety system upgradation for the flight simulator system installation.
Electrical System Upgradation for nee generator system in flight maintenance Hangers – 01,02 & 03. Scope of Works includes installation of New explosion proof light fittings (240 no) and MICC cabling work for New circuits with explosion proof control switches.
Upgradation works for Phlebotomy – Labs for Nine Health centers. Scope of Works Includes all MEP Services upgradation including with minor civil and carpentry renovation works
Supply and Installation of Mechanical Louver System for the multistoried building – scope of work includes, design, Consultation, supply and Installation of 2500 sqm metallic louvers of 3 mtr Height
MEPD services for the LAB, scope of works includes all required electrical, HVAC plumbing & Drainage line works for the LAB:
Electrification works for Medical Collage Lab in Various locations in the Building. Scope of works Includes Design, Supply, and Installation of all Required Electrical Works for Upgrading the Electrical Systems in the Lab Building including with additional Power and Light Points.
Supply and Installation of New MV Panel for QRC—Main Office building 1 No 2500A Capacity mv panel removed and installation of same capacity new mv panel Including with frame works, cable termination, All required panel testing and commissioning – Two Days Shutdown.
Supply and Installation of New MV Panel for QRC—Main Office building 1 No 2500A Capacity mv panel removed and installation of same capacity new mv panel Including with frame works, cable termination, All required panel testing and commissioning – Two Days Shutdown.
Supply and Installation of New MV Panel for QRC—Main Office building 1 No 2500A Capacity mv panel removed and installation of same capacity new mv panel Including with frame works, cable termination, All required panel testing and commissioning – Two Days Shutdown.
MEP & CIVIL Works Maintenance – Includes Maintenance of Five Nos. Substations 1600 KVA, MV Panels – 5 Nos. 2500A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installation, Maintenance of 1000KVA Generator including with Synchronization Panel, Installation of Pole Lights around the Campus & Parking Area & Garden Ares – 12 Meters. Height.
Electrification Works for the Aluminum & Glass Factory – Includes Installation of Three Nos. Transformer – 1600 KVA, Installation of MV Panels – 3 Nos. 2500A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations, Installation of 1000KVA Generator including with Synchronization Panel, Installation of Pole Lights around the Factory 12 Meters. Height.
Electrification Works for the Glass Factory – Includes Installation Transformer – 1000 KVA, Installation of MV Panels 1200A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations.
Electrification Works for the Glass Factory – Includes Installation Transformer – 1000 KVA, Installation of MV Panels 1200A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations
Refurbishment of Condenser Units for Building CRB at Missile Stores.
Our scope of work includes the maintenance of all types of Electrical, Mechanical, HVAC & Plumbing works
Design and Construction of warehouse for Medical Store
Networking Projects
Our scope of work includes all Electrification, Plumbing and Drainage works
Our scope of work includes the installation of Pre-set Flow Meter with modification in the Existing pipeline.
Replacement of High Pressure Pumps and Transfer Pump at North Army Camp RO Plant.
Refurbishment/Replacement of SS Manifolds, Chequered Plates & UPVC Pipes at North Army Camp RO Plant.
Work Service for the Replacement of Old UPVC Pipelines of Abu-Samra R.O Plant.
Electrification Works for the Labor Accommodations – Includes Installation of Transformer – 1000 KVA, Installation of MV Panels 1600A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations, etc.
Electrification Works for the Office Buildings – Includes Installation of Transformer – 1600 KVA, Installation of MV Panels 2500A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations, Installation of 750KVA Generator including with Synchronization Panel.
Electrification works for 20 Health Centers in Various locations in Qatar. Scope of works Includes Design, Supply, and Installation of all Required Electrical Works for Upgrading the Electrical Systems in Health Centers including with additional Power and Light Points.
Electrification Works for the Steel & Galvanizing Factory – Includes Installation of Two Nos. Transformer – 1600 KVA, Installation of MV Panels – 2 Nos. 2500A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations, Installation of 1000KVA Generator including with Synchronization Panel, Installation of Pole Lights around the Factory 12 Mtr. Height.
Installation of MV Panels, Feeder Pillar Panels, Control Panels and Cabling for Highway Pole Lighting. (Light Pole Installation Excluded)
Installation of Feeder Pillar Panels, Control Panels and Cabling for Pole Lighting.
Installation of 2500A MV Panel and 1200KVA Generators with Control Panels. (Light Pole Installation Excluded)
Installation of Feeder Pillar Panels, Control Panels and Cabling for Pole Lighting.
Installation of 2500A MV Panel and 1000KVA Generators with Control Panels (Light Pole Installation Included)
Installation of Feeder Pillar Panels, Control Panels and Cabling for Pole Lighting.
Installation of 1600A MV Panel and 1200KVA Generators with Control Panels.
Project: Pearl Qatar – Project Office and Facilities.
Electrification Works for Barracks – Included Installation of Panel Boards, Control Panels and Power Cabling as well as Small Power Equipment / Devices.
Electrification Works for the Glass Factory – Includes Installation of Three Nos. Transformer – 1600 KVA, Installation of MV Panels – 3 Nos. 2500A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations, Installation of 1000KVA Generator including with Synchronization Panel, Installation of Pole Lights around the Factory 12 Meters. Height.
Electrification Works for the School Building – Includes Installation of Four Nos. Transformer – 1600 KVA, Installation of MV Panels – 4 Nos. 2500A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations, Installation of 1000KVA Generator including with Synchronization Panel, Installation of Pole Lights around the Compound 12 Meters. Height.
Electrification Works for the Five Block Buildings – Includes Installation of MV Panels – 3 Nos. 2500A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations, Installation of 1000KVA Generator including with Synchronization Panel, Installation of Pole Lights Cabling around the Compounds.
MEP & CIVIL Works Maintenance – Includes Maintenance of Five Nos. Substations 1600 KVA, MV Panels – 5 Nos. 2500A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installation, Maintenance of 1000KVA Generator including with Synchronization Panel, Installation of Pole Lights around the Campus & Parking Area & Garden Ares – 12 Meters. Height.
Electrification Works for the Aluminum & Glass Factory – Includes Installation of Three Nos. Transformer – 1600 KVA, Installation of MV Panels – 3 Nos. 2500A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations, Installation of 1000KVA Generator including with Synchronization Panel, Installation of Pole Lights around the Factory 12 Meters. Height.
Electrification Works for the Glass Factory – Includes Installation Transformer – 1000 KVA, Installation of MV Panels 1200A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations
Electrification Works for the Glass Factory – Includes Installation Transformer – 1000 KVA, Installation of MV Panels 1200A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations
Refurbishment of Condenser Units for Building CRB at Missile Stores.
Our scope of work includes the maintenance of all types of Electrical, Mechanical, HVAC & Plumbing works
Design and Construction of warehouse for Medical Store
Networking Projects
Our scope of work includes all Electrification, Plumbing and Drainage works
Our scope of work includes the installation of Pre-set Flow Meter with modification in the Existing pipeline.
Replacement of High Pressure Pumps and Transfer Pump at North Army Camp RO Plant.
Refurbishment/Replacement of SS Manifolds, Chequered Plates & UPVC Pipes at North Army Camp RO Plant.
Work Service for the Replacement of Old UPVC Pipelines of Abu-Samra R.O Plant.
Electrification Works for the Labor Accommodations – Includes Installation of Transformer – 1000 KVA, Installation of MV Panels 1600A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations, etc.
Electrification Works for the Office Buildings – Includes Installation of Transformer – 1600 KVA, Installation of MV Panels 2500A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations, Installation of 750KVA Generator including with Synchronization Panel.
Electrification works for 20 Health Centers in Various locations in Qatar. Scope of works Includes Design, Supply, and Installation of all Required Electrical Works for Upgrading the Electrical Systems in Health Centers including with additional Power and Light Points.
Electrification Works for the Steel & Galvanizing Factory – Includes Installation of Two Nos. Transformer – 1600 KVA, Installation of MV Panels – 2 Nos. 2500A, All Associated Panels Power Cabling As well as Small Power Cabling, Equipment / Device Installations, Installation of 1000KVA Generator including with Synchronization Panel, Installation of Pole Lights around the Factory 12 Mtr. Height.